Analysis Of Factors Influencing Project Failure Risk On Development Building In Tangerang Using SEM PLS And IPMA Methods
DOI:
https://doi.org/10.64252/fd161h53Keywords:
risk failure project, SEM-PLS, IPMA, management project, quality projectAbstract
Risk failure in project construction Building is challenge main Which This has implications for financial losses, delays, and quality degradation. This study aims to analyze the influence of human resources, project management, and quality on the risk of failure of building construction projects in Tangerang. A quantitative method was used with the Structural Equation Modeling Partial Least Square (SEM-PLS) approach and Importance Performance Map Analysis (IPMA) as analytical tools. The results show that all three independent variables influential significant against risk failure project, Good directly and through role mediation. IPMA identify that improvement Project management and work quality are priority areas in risk mitigation strategies. This study makes a significant contribution to the construction management literature and offers strategic guidance for industry stakeholders in improving project efficiency and effectiveness.