[1]
2025. Compressing Construction Project Schedules: A Fast-Tracking Technique in the Administration of Construction Projects with Case Studies. International Journal of Environmental Sciences. (Aug. 2025), 2309–2324. DOI:https://doi.org/10.64252/2syz8j92.